Vincent Thomas Bridge to Close for 16 Months of Repairs
The 63-year-old Vincent Thomas Bridge will be closed to all traffic on November 7 while crews replace its deteriorating deck. The span connects San Pedro with Terminal Island and carries about 53,000 vehicles a day, including roughly 4,600 heavy trucks. Caltrans says the bridge remains structurally sound, but inspections found the deck had deteriorated amid heavy traffic, including trucks serving the Los Angeles and Long Beach harbors.
The $750 million project will also update the center barrier, railings, fencing and other safety features, and add seismic sensors and utilities. Caltrans chose a full closure after considering partial and overnight work plans that would have prolonged construction for between 25 and 48 months. The work is expected to continue until at least March 2028.
Drivers will need to use detours, including routes involving the 110, 47 and 710 freeways, or Anaheim Street and Pacific Coast Highway. The bridge is often the fastest connection between San Pedro and Long Beach; one local commuter estimates his usual 15-minute trip could take 30 to 45 minutes. Local officials have arranged road repairs on some detour routes, and Los Angeles transportation officials are being asked to monitor Anaheim Street. Caltrans also plans to place traffic officers at key intersections.
San Pedro businesses fear longer trips could discourage customers. A local pet-supply shop owner said customers from Long Beach have already asked how they will reach the store. The Warner Grand Theatre’s nonprofit operator said 10% to 15% of its audience comes from Long Beach and hopes longer drives will not keep people away. A San Pedro restaurant family also described the closure as another challenge for small businesses.
Reported by LAist, FOX 11 Los Angeles.






